At the intersection of the roads Simmeringer Hauptstraße and Pantucekgasse in Vienna the tracks were renewed and an additional connection between the tracks on the Simmeringer Hauptstraße and the Pantucekgasse was build. These tracks are used by the Viennese tramway lines 11 and 71. To secure the surrounding houses from Noise and Vibration, a Mass-Spring System was used for the tracks. This reduces the distribution of vibrations to the buildings.
We supported the project with preparing drawings regarding the location of the expansion joints of the different elements of the Mass-Spring System and with the reinforcement drawings.