<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Slab track in tunnel &#8211; Schembera Consulting ZT</title>
	<atom:link href="https://www.schembera.at/en/category/fixed-lane-in-the-tunnel/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.schembera.at</link>
	<description>Planung von Festen Fahrbahnen und Masse-Feder Systemen</description>
	<lastBuildDate>Mon, 01 Dec 2025 14:50:43 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://www.schembera.at/wp-content/uploads/2019/05/cropped-schembera-icon-32x32.png</url>
	<title>Slab track in tunnel &#8211; Schembera Consulting ZT</title>
	<link>https://www.schembera.at</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Mountfield Tunnel</title>
		<link>https://www.schembera.at/en/mountfield-tunnel/</link>
		
		<dc:creator><![CDATA[Victoria]]></dc:creator>
		<pubDate>Thu, 25 May 2023 10:01:44 +0000</pubDate>
				<category><![CDATA[Slab track in tunnel]]></category>
		<guid isPermaLink="false">https://www.schembera.at/?p=516</guid>

					<description><![CDATA[The Mountfield Tunnel is a single track tunnel in the south of England on the Turnbridge Wells to Hastings line in Kent, which was built 170 years ago. The track system inside the tunnel is a Pact system, which was built in the 1970s, that has to be renewed after 50 years of wear and&#8230;&#160;<a href="https://www.schembera.at/en/mountfield-tunnel/" rel="bookmark">Read More &#187;<span class="screen-reader-text">Mountfield Tunnel</span></a>]]></description>
										<content:encoded><![CDATA[
<p>The Mountfield Tunnel is a single track tunnel in the south of England on the Turnbridge Wells to Hastings line in Kent, which was built 170 years ago. The track system inside the tunnel is a Pact system, which was built in the 1970s, that has to be renewed after 50 years of wear and tear in different phases. The portal at the north is called Robertsbridge portal, and the south portal is the Battle portal.&nbsp;&nbsp;</p>



<p>Phase 1 of the renewal works took place at the Robertsbridge portal, where a new track system was installed with a length of approximately 30 m. The slab track system is a reinforced concrete slab, with embedded sleeper type Cemex 1503. This track was designed by Schembera Consulting ZT, and installed in a 9 day line closure in October 2022.&nbsp;</p>



<p>The 2<sup>nd</sup> phase of the works took place at the Battle portal at a length of 230 m. The Pact slab was replaced with a slab track using Delkor Alt1 rail fastenings, which were embedded in reinforced concrete. The design of this track was reviewed by Schembera Consulting ZT as a CAT 3 checker.&nbsp;</p>


<div class="wp-block-image">
<figure class="alignleft"><a href="https://www.schembera.at/wp-content/uploads/2025/12/Referenzblatt_Mountfield-Tunnel_DE_25-12.pdf" target="_blank" rel="noreferrer noopener"><img decoding="async" src="https://www.schembera.at/wp-content/uploads/2019/05/pdf-symbol.jpg" alt="Dieses Bild hat ein leeres Alt-Attribut. Der Dateiname ist pdf-symbol.jpg"/></a><figcaption class="wp-element-caption">Download Project Sheet</figcaption></figure>
</div>


<p></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>King´s Cross – Gasworks Tunnel</title>
		<link>https://www.schembera.at/en/kings-cross-gasworks-en/</link>
		
		<dc:creator><![CDATA[Karin_Design]]></dc:creator>
		<pubDate>Thu, 18 Jul 2019 06:44:41 +0000</pubDate>
				<category><![CDATA[Slab track in tunnel]]></category>
		<guid isPermaLink="false">https://www.schembera.at/?p=324</guid>

					<description><![CDATA[The Gasworks Tunnel, East Bore, which has been out of service for decades, is located just outside London&#8217;s King&#8217;s Cross Station. The slab track system is Slab Track Austria (STA) and LVT Standard at the crossover. Just outside London&#8217;s King&#8217;s Cross rail station, there are 3 tunnels, the so-called Gasworks tunnels. The eastern tunnel (East&#8230;&#160;<a href="https://www.schembera.at/en/kings-cross-gasworks-en/" rel="bookmark">Read More &#187;<span class="screen-reader-text">King´s Cross – Gasworks Tunnel</span></a>]]></description>
										<content:encoded><![CDATA[
<p>The Gasworks Tunnel, East Bore, which has been out of service for decades, is located just outside London&#8217;s King&#8217;s Cross Station. The slab track system is Slab Track Austria (STA) and LVT Standard at the crossover.</p>



<p> Just outside London&#8217;s King&#8217;s Cross rail station, there are 3 tunnels, the so-called Gasworks tunnels. The eastern tunnel (East Bore) was activated again after several decades, during which it was not in operation for railways. The tracks in this tunnel were designed as a slab track, System SlabTrack Austria (STA). Only the crossovers were made in the LVT standard track system. Transitions to the tracks in ballast were arranged outside the two tunnel portals. </p>



<p>Schembera Consulting ZT was acting as consultant for the general planning of the slab track STA and the LVT crossover. In addition, we were also responsible for checking the slab track design, switches and crossings, track slabs with derailment protection, the track slabs with softer bearings, the load distribution plate in the area of the tunnel portals, and transition areas to the ballasted track.</p>


<div class="wp-block-image">
<figure class="alignleft"><a href="https://www.schembera.at/wp-content/uploads/2025/12/Project-Sheet_Gasworks-Tunnel_EN_25-12.pdf" target="_blank" rel="noreferrer noopener"><img decoding="async" src="https://www.schembera.at/wp-content/uploads/2019/05/pdf-symbol.jpg" alt="Dieses Bild hat ein leeres Alt-Attribut. Der Dateiname ist pdf-symbol.jpg"/></a><figcaption class="wp-element-caption">Download Project Sheet</figcaption></figure>
</div>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
